Skip to content

OEE calculator

Enter one shift’s data to get OEE, the three factors behind it, and how many minutes went to stops, to slow running and to scrap.

Shift data

min
Shift length minus planned stops (meals, breaks, scheduled maintenance).
min
Breakdowns, changeovers, waiting for material or people within planned time.
s/part
The fastest cycle the machine is designed to run, per part.
parts
parts

Result

73.3%OEE
Typical, with room to improve
Availability88.9%
World class: 90.0%
Performance85.0%
World class: 95.0%
Quality97.1%
World class: 99.9%

Where the planned time went

  • Good parts at ideal speed330 min
  • Quality loss (scrap)10 min
  • Performance loss (speed)60 min
  • Availability loss (stops)50 min

Your biggest loss is performance: 60 min running below the ideal cycle. Look for minor stops and reduced speed.

Good parts
660
Run time
400 min
Output at ideal cycle
800

How to calculate OEE

OEE answers one question: of all the time the machine was supposed to be producing, how much became good parts at the ideal speed? The math splits the answer into three losses, and each has a different cause.

OEE = Availability × Performance × Quality

Factor Formula What it measures
Availability run time ÷ planned production time losses from stops (breakdowns, changeovers, no material)
Performance (ideal cycle time × total count) ÷ run time speed losses (minor stops, reduced speed)
Quality good count ÷ total count scrap and rework losses

Planned production time is the shift minus planned stops such as meals, breaks and scheduled maintenance. Run time is planned production time minus unplanned stops.

Worked example

The values already filled in the calculator describe an 8-hour shift with a 30-minute meal break:

  • Planned production time: 480 − 30 = 450 min
  • Unplanned stops: 50 min, so run time = 400 min
  • Ideal cycle time: 30 s per part
  • Total count: 680 parts, of which 20 were rejected

The three factors:

  1. Availability = 400 ÷ 450 = 88.9%
  2. Performance = (30 s × 680) ÷ (400 × 60 s) = 20,400 ÷ 24,000 = 85.0%
  3. Quality = 660 ÷ 680 = 97.1%

OEE = 0.889 × 0.850 × 0.971 = 73.3%.

In minutes, the 450 planned minutes produced 330 minutes’ worth of good parts at ideal speed. The other 120 were lost like this: 50 to stops, 60 to running below ideal speed and 10 making the 20 rejected parts. Here the biggest loss is performance, not the stops that usually get the blame.

How to read the result

  • 85% or more: world class for discrete manufacturing. Few lines sustain it.
  • 60% to 85%: where most plants that measure and work on losses sit.
  • Below 60%: there are big losses, usually easy to find. 40% is common when measurement starts.

The number alone says little. What tells you what to do is which factor is lowest:

  • Low availability: log the stops and build a Pareto by cause. Breakdowns call for preventive maintenance and root cause analysis; long changeovers call for SMED.
  • Low performance: look for minor stops nobody records (jams, adjustments, waiting for an operator) and machines running below rated speed. Also check that the ideal cycle time is right.
  • Low quality: go after the main scrap cause with a fishbone diagram and 5 Whys, and count rework as a loss even when the part is saved.

Common OEE mistakes

  • Using the average cycle instead of the ideal cycle. The average already includes speed losses and makes performance look close to 100%.
  • Taking changeovers out of planned time. The loss disappears from the metric and stops being worked on.
  • Counting rework as good. Quality in OEE means good the first time.
  • Comparing OEE across different machines. OEE tracks how one machine or line improves over time; it is not a league table.
  • Measuring by hand once a month. Short, forgotten stops are exactly what drags performance down. The closer to real time the logging, the more honest the OEE.

Frequently asked questions

What is OEE?

OEE (Overall Equipment Effectiveness) measures how much of the planned production time became good parts at the ideal speed. It is the product of three factors: availability, performance and quality.

What is the OEE formula?

OEE = Availability × Performance × Quality. Availability = run time ÷ planned production time; Performance = (ideal cycle time × total count) ÷ run time; Quality = good count ÷ total count.

What is a good OEE score?

World class is usually given as 85% (90% availability, 95% performance, 99.9% quality). Many plants are between 40% and 60% when they start measuring. The trend, and knowing which factor drags OEE down, matter more than the number itself.

Is changeover time counted in OEE?

Yes. In classic OEE, changeovers are unplanned stops that reduce availability, even when they are on the day’s schedule. That is why cutting changeover time with SMED raises OEE.

What is the difference between OEE and TEEP?

OEE uses planned production time as its base. TEEP uses all calendar time (24/7), so it also shows capacity left unused because of missing shifts or demand.

Can OEE be over 100%?

No. If you get more than 100%, the ideal cycle time is set too slow or the counts are wrong. Use the fastest cycle the equipment is designed for, not the average cycle.