Enter how many units you inspected, how many defects you found and how many defect opportunities each unit has. Get DPMO, PPM, yield and sigma level, and roll up the first pass yield of your process steps.

Inspection data

units
defects
per unit
The places on a unit where a defect can occur and is checked. Use 1 if a unit is simply good or bad.
units
How many units had at least one defect. Gives defective PPM and FPY.

Process FPY and RTY (optional)

One step per line: step; FPY (99.2, 99.2% or 0.992), or step; units in; good first time. Paste straight from a spreadsheet.

Result

4.69sigma level (short term, with the 1.5σ shift)
Between 4σ and 5σ

35 defects in 50,000 opportunities (5,000 units × 10).

DPMO
700
DPU (defects per unit)
0.007
DPO (defects per opportunity)
0.0007
Yield (1 − DPO)
99.93%
Long-term Z (no 1.5 shift)
3.19
Poisson yield e^(−DPU)
99.30%
Defective PPM
5,600
Unit FPY
99.44%

Sigma level table

Sigma levelDPMOYield
1σ690,00031%
2σ308,53869.1%
3σ66,80793.32%
4σ you6,21099.379%
5σ23399.9767%
6σ3.499.99966%

Process FPY and RTY (optional)

RTY (rolled throughput yield)
93.8%

Out of every 100 units that start the process, about 94 get through every step with no rework or scrap.

The step that drags RTY down most is Crimping, at 97.5% FPY.

StepFPYRolled
Cutting99.2%99.2%
Crimping97.5%96.7%
Assembly98.0%94.8%
Electrical test99.0%93.8%

How to calculate DPMO and sigma level

You need three counts: units inspected, defects found and defect opportunities per unit. An opportunity is a spot on the unit where a defect can occur and that you actually check: a wire harness with 10 crimps has 10 opportunities.

DPU = defects ÷ units

DPO = defects ÷ (units × opportunities)

DPMO = DPO × 1,000,000

Sigma level = Z(1 − DPO) + 1.5

Term Meaning
DPU average defects per unit
DPO and DPMO defects per opportunity, and the same rate per million opportunities
Yield 1 − DPO: the share of opportunities without a defect
Z the standard normal value with the yield to its left (NORM.S.INV in Excel)
Defective PPM bad units per million units: defectives ÷ units × 1,000,000

The 1.5 sigma shift

The Z you get from the yield is long-term performance. The sigma level in six sigma tables adds 1.5 to it. The idea came out of Motorola in the 1980s (Bill Smith and Mikel Harry): a process mean drifts by up to 1.5 standard deviations over months, so the process “in the short term” is taken to be 1.5 sigma better than its defect count shows.

It is a convention, not a law. Nobody measured 1.5 on every process, and writers such as Donald Wheeler argue against it. But it is what turns 3.4 DPMO into six sigma, and it is what everyone means when they compare sigma levels. The calculator shows both: the conventional sigma level and the long-term Z without the 1.5.

Sigma level table

With the 1.5 shift:

Sigma level DPMO Yield
1σ 690,000 31%
2σ 308,538 69.1%
3σ 66,807 93.32%
4σ 6,210 99.379%
5σ 233 99.9767%
6σ 3.4 99.99966%

Worked example

The values preloaded in the calculator come from a wire harness inspection:

  • 5,000 harnesses inspected, each with 10 crimps (10 opportunities)
  • 35 defects found, on 28 harnesses (a few had more than one)

The math:

  1. DPU = 35 ÷ 5,000 = 0.007 defects per harness
  2. DPO = 35 ÷ (5,000 × 10) = 35 ÷ 50,000 = 0.0007
  3. DPMO = 0.0007 × 1,000,000 = 700
  4. Yield = 1 − 0.0007 = 99.93%
  5. Long-term Z = Z(0.9993) = 3.19
  6. Sigma level = 3.19 + 1.5 = 4.69σ, between 4σ and 5σ on the table

With the 28 defective units: defective PPM = 28 ÷ 5,000 × 1,000,000 = 5,600, and harness first pass yield is 1 − 28 ÷ 5,000 = 99.44%. Note the gap: 700 DPMO and 5,600 PPM describe the same lot. DPMO divides by opportunities, PPM counts units.

The Poisson yield, e^(−0.007) = 99.30%, estimates first pass yield when all you have is the defect total, assuming defects land on units at random. Here it comes close to the actual 99.44%.

First pass yield and rolled throughput yield

A step’s first pass yield (FPY) is the share of units that come out right the first time, with no rework or scrap:

FPY = units good the first time ÷ units into the step

RTY = FPY₁ × FPY₂ × … × FPYₙ

The calculator’s example has four steps: cutting 99.2%, crimping 97.5%, assembly 98% and electrical test 99%. Rolled throughput yield = 0.992 × 0.975 × 0.98 × 0.99 = 93.8%. Each step looks fine on its own, yet only 94 harnesses in 100 make it through the whole line untouched. Crimping costs the most, so that is where improvement starts.

RTY is always lower than the worst step’s FPY, and it exposes the “hidden factory”: rework that never shows in final yield because the fixed unit ships as good.

How to read the result

  • Compare processes by DPMO, not by defect count. A complex part has more opportunities and will show more defects even when it is well made.
  • Below 3σ (over 66,807 DPMO) the process makes defects all the time and inspection becomes routine. 3σ to 4σ is where many plants sit. 4σ and up is a good process for most industries.
  • Use sigma level to track a trend on the same process, month by month. To go after the defects, build a Pareto chart by defect type and find the few that make up most of them.
  • If the characteristic is measured (a diameter, a torque), use Cp and Cpk instead: they tell spread from centering, which a defect count cannot.

Common mistakes

  • Padding the opportunities. Counting 50 opportunities where only 10 get checked cuts DPMO and improves sigma level on paper. Count only what is inspected and can really fail, and keep the definition stable over time.
  • Mixing up DPMO and PPM. A customer asking for PPM wants defective units, not defects per opportunity.
  • Forgetting the 1.5 when comparing. A long-term Z of 3 is 4.5 on the conventional scale. Always say which one you mean.
  • Small samples. With few defects, one more or less moves the result a lot. With zero defects there is no sigma level to compute: inspect more.
  • Multiplying final yields. RTY uses each step’s first pass yield, counting a reworked unit as a miss. Using yield after rework hides exactly what RTY is meant to show.

Defects cost money too: see what scrap and rework cost each month with the cost of poor quality calculator.

Frequently asked questions

How do you calculate sigma level?

Work out DPO (defects ÷ (units × opportunities per unit)), find the standard normal Z for a yield of 1 − DPO, then add 1.5. In Excel: =NORM.S.INV(1 − DPO) + 1.5. The calculator above does it and shows where you land on the sigma table.

How do you calculate DPMO?

DPMO = defects ÷ (units × opportunities per unit) × 1,000,000. With 35 defects on 5,000 units of 10 opportunities each, that is 35 ÷ 50,000 × 1,000,000 = 700 DPMO.

What is the difference between DPMO and PPM?

DPMO counts defects per million opportunities. Defective PPM counts bad units per million units, however many defects each one has. They only match when a unit has a single defect opportunity.

How many defects is six sigma?

3.4 defects per million opportunities, using Motorola’s convention that a process drifts 1.5 standard deviations over the long run. Without that shift, 3.4 DPMO would be 4.5 sigma.

What is the 1.5 sigma shift?

A convention from Motorola in the 1980s: it assumes the process mean wanders by up to 1.5 standard deviations over time, so short-term sigma level is the long-term Z plus 1.5. It is a rule of thumb rather than a statistical law, and some experts reject it.

How do you calculate rolled throughput yield?

Multiply the first pass yields of every step. Four steps at 99.2%, 97.5%, 98% and 99% give 0.992 × 0.975 × 0.98 × 0.99 = 93.8%: the chance a unit gets through the whole process with no rework or scrap.