Skip to content

Pareto chart maker

Paste your defect or downtime causes with their counts and get the Pareto chart right away, with the cumulative percentage, the vital few and the ABC classes.

Your data

One cause per line: cause; count. Paste the two columns straight from a spreadsheet or type. Repeated causes are added up, so you can paste a log with one line per occurrence.

Result

3vital few causes (class A), out of 8

These 3 causes make up 80.1% of the total (306 of 382).

Pareto chart

00%5025%10050%15075%200100%Flash: 152FlashVoids: 96VoidsScratch: 58ScratchDimension: 31DimensionStain: 18StainShort shot: 12Short shotWarpage: 9WarpageDirt: 6Dirt

Start with Flash, Voids, and Scratch. Fixing these causes tackles 80.1% of the problem.

ABC table (largest first)

CauseCount% of totalCum. %Class
Flash15239.8%39.8%A
Voids9625.1%64.9%A
Scratch5815.2%80.1%A
Dimension318.1%88.2%B
Stain184.7%92.9%B
Short shot123.1%96.1%B
Warpage92.4%98.4%C
Dirt61.6%100.0%C

Class A: the causes up to crossing 80% of the total. B: up to 95%. C: the rest.

How to calculate a Pareto chart

A Pareto chart sorts the causes from largest to smallest and tracks how much of the problem is explained as each cause is added.

Cause share = cause count ÷ total

Cumulative % = sum of the counts down to the cause ÷ total

Class Rule used here
A (vital few) causes up to crossing 80% of the total, including the one that crosses the line
B the next ones, up to crossing 95%
C (trivial many) the rest

The cause that pushes the total past 80% belongs to class A because it is the one that brings the cumulative line up to the mark. Without it, the vital few would explain less than 80% of the problem.

Worked example

The values already in the tool are the parts an injection molding machine scrapped in a month, by defect, in the order someone logged them: scratch 58, flash 152, stain 18, voids 96, dimension 31, warpage 9, short shot 12 and dirt 6. The total is 382 parts.

Sorted from largest to smallest:

Defect Parts % of total Cumulative % Class
Flash 152 39.8% 39.8% A
Voids 96 25.1% 64.9% A
Scratch 58 15.2% 80.1% A
Dimension 31 8.1% 88.2% B
Stain 18 4.7% 92.9% B
Short shot 12 3.1% 96.1% B
Warpage 9 2.4% 98.4% C
Dirt 6 1.6% 100% C

Flash, voids and scratches are 3 of the 8 defects and add up to 306 parts, 80.1% of the scrap. Fixing flash alone removes almost 40% of the scrapped parts.

How to read the result

  • The dark bars are the vital few. That is where effort pays off most. Start with the first bar, not with the easiest cause.
  • The red line is the cumulative share, read on the right axis. Where it crosses the dashed 80% line is the class A cutoff.
  • A curve that climbs slowly, with no bar standing out, means there is no clear vital few. That usually points to causes that are too broad (“machine problem”) or to count not being the right measure. Try the Pareto by cost or by downtime minutes.
  • After acting, redo the Pareto with the next period’s data. If the bar dropped, the fix worked, and the next cause becomes the new first bar.

For machine breakdowns, a Pareto by asset pairs well with the MTBF and MTTR calculator, and the lost time shows up in the OEE calculator. When the cause you picked is a process risk, rate it in the FMEA RPN and Action Priority calculator.

Common mistakes

  • Letting “Other” grow too big. If “Other” is one of the tallest bars, it hides causes that should be visible. Break it down.
  • Mixing measures. Scrapped parts, downtime minutes and money lost do not add up. Build one Pareto per measure.
  • Counting only occurrences when costs differ a lot. A rare defect that scraps an expensive part can matter more than a frequent, cheap one.
  • Using too short a period. With little data the order of the bars changes from week to week. Collect at least a few weeks.
  • Stopping at the Pareto. It shows where to act, not why it happens. The root cause comes from an analysis such as a fishbone with 5 whys.

Frequently asked questions

What is a Pareto chart?

A bar chart of the causes of a problem sorted from largest to smallest, with a line for the cumulative percentage. It shows which few causes make up most of the problem, so you know where to start.

How do you make a Pareto chart?

Count how often each cause happened in the period, sort them from largest to smallest, work out each one’s share of the total and keep adding the shares to get the cumulative percentage. Bars show the counts and the line shows the cumulative share. On this page you only paste the causes and counts.

How do you calculate the cumulative percentage?

With the causes sorted, the cumulative percentage of a row is the sum of the counts down to that row divided by the total. The first cause’s cumulative equals its own share, and the last one always closes at 100%.

What is the 80/20 rule?

The observation that roughly 80% of the effects come from roughly 20% of the causes. It is not an exact law: sometimes 3 causes make 70%, sometimes 2 make 90%. The point is that a few causes carry most of the problem.

What is the difference between Pareto and ABC analysis?

It is the same math. ABC analysis names the bands of the cumulative curve: class A is the causes up to crossing 80% of the total, class B goes up to 95% and class C is the rest. Quality people call class A the vital few.

When should you use a Pareto chart?

Whenever there are many causes and not enough time to tackle them all: defects on a line, machine downtime reasons, customer complaints, scrap items. Once you pick the cause, use a fishbone with 5 whys to get to the root cause.